Check a Project's load history
See how hard a managed Project worked over time instead of guessing from one moment.
Open the history
- Open Projects and select the managed Project.
- In the Resources section, select the CPU, RAM, Disk or IO meter.
The Load history window opens for that Project. The same meters appear on a running desktop preview.
Choose a period and resources
- Open the period selector, which shows Last 24 hours at first, and pick Last hour, Last 6 hours, Last 7 days, Last 30 days or a custom range.
- Tick at least one metric under Resources; more than one draws several lines.
- Read the period shown above the chart. If it differs from your choice, Chetty adjusted it to the history it has.
History is kept for 30 days; the last 48 hours are detailed and older readings appear as hourly summaries.
Read the numbers
- CPU and memory show their share of the environment's limit in percent.
- Disk shows its share of the Project's disk limit.
- IO shows its share of the disk speed limit, or MB/s when no limit is set.
- Network shows Mb/s.
- Gaps are periods without a reading, not zero load. They follow a stopped environment or a missing measurement.
- Brief spikes can fall between readings, and disk figures can lag by several minutes.
- Last known figures marks values that are no longer live.
Tip: Open the history after a slow build or a failed command to see whether the environment was short of CPU, memory, disk space or disk speed.
Related guides
Read Manage a managed environment to raise a limit or free disk space, and Projects overview for the other Project tasks.